Foxter
Agent
Tooting Rear Dormer Build — On Site completed loft conversions

South London · SW17 · 2025

Tooting Rear Dormer Build — On Site

Category

Loft Conversions

Area

Tooting (SW17)

Duration

11 weeks

Completed

2025

Overview

Scaffold up, timber dormer frame erected off the steel goalpost and the roof felted and battened before slating. Sample loft conversion case study in Tooting (SW17) — during construction stage, built by the Foxter site team.

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Structural design & calculations
  • Building control & party wall
  • Scaffold & roof strip-out
  • Steel beam installation
  • New floor joists & decking
  • Dormer construction & roofing
  • Rooflights & windows
  • Insulation & fire protection
  • Loft staircase joinery
  • Electrics & plumbing first fix
  • Plastering & decoration
  • Snagging & handover

Materials used

Steel goalpostTimber dormer frameRoof membraneSlate & zinc

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 11 weeks

Gallery

Tooting Rear Dormer Build — On Site — Dormer carcass and steel goalpost from the scaffold
Dormer carcass and steel goalpost from the scaffold
Tooting Rear Dormer Build — On Site — How the zinc-clad dormer reads once finished
How the zinc-clad dormer reads once finished

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — SW17 loft conversion (portfolio example, not a real client review)

Project area

Approximate area only — Tooting, SW17. No property addresses are published.