Foxter
Twickenham Air Conditioning completed air conditioning

South West London · TW1 · 2025

Twickenham Air Conditioning

Category

Air Conditioning

Area

Twickenham (TW1)

Duration

7 months

Completed

2025

Overview

Concealed air conditioning with ducted units and discrete linear grilles. Sample case study set in Twickenham (TW1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 7 months

Gallery

Twickenham Air Conditioning — Leisure space
Leisure space
Twickenham Air Conditioning — Air Conditioning detail
Air Conditioning detail
Twickenham Air Conditioning — Before works commenced
Before works commenced
Twickenham Air Conditioning — During construction
During construction
Twickenham Air Conditioning — First fix underway
First fix underway
Twickenham Air Conditioning — Close-up craftsmanship
Close-up craftsmanship
Twickenham Air Conditioning — Living space completed
Living space completed
Twickenham Air Conditioning — Kitchen detail
Kitchen detail
Twickenham Air Conditioning — Bathroom finishes
Bathroom finishes
Twickenham Air Conditioning — Loft level
Loft level
Twickenham Air Conditioning — Exterior
Exterior
Twickenham Air Conditioning — Garden
Garden
Twickenham Air Conditioning — Rear elevation
Rear elevation
Twickenham Air Conditioning — Roof detail
Roof detail
Twickenham Air Conditioning — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — TW1 cooling (portfolio example, not a real client review)

Project area

Approximate area only — Twickenham, TW1. No property addresses are published.