Overview

Full rewire with new consumer unit, lighting design and smart controls. Sample case study set in Wandsworth (SW18).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting
  • Flooring
  • Building control sign-off

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 14 weeks

Gallery

Wandsworth Electrical — Garden
Garden
Wandsworth Electrical — Electrical detail
Electrical detail
Wandsworth Electrical — Rear elevation
Rear elevation
Wandsworth Electrical — Roof detail
Roof detail
Wandsworth Electrical — Wider context
Wider context
Wandsworth Electrical — Lower ground level
Lower ground level
Wandsworth Electrical — Leisure space
Leisure space
Wandsworth Electrical — Before works commenced
Before works commenced
Wandsworth Electrical — During construction
During construction
Wandsworth Electrical — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — SW18 electrical (portfolio example, not a real client review)

Project area

Approximate area only — Wandsworth, SW18. No property addresses are published.