West London · W3 · 2025
Acton Gas Installation
Category
Gas Installation
Area
Acton (W3)
Duration
16 weeks
Completed
2025
Overview
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Acton (W3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 16 weeks
Gallery

















Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — W3 gas works (portfolio example, not a real client review)
Project area
Approximate area only — Acton, W3. No property addresses are published.
Related projects
All projects →
W4Gas Installation · 2021
Chiswick Gas Installation
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Chiswick (W4).
View project →
E1WGas Installation · 2025
Wapping Gas Installation
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Wapping (E1W).
View project →
N1Gas Installation · 2022
Islington Gas Installation
Gas supply upgrade and appliance installation certified on completion. Sample case study set in Islington (N1).
View project →