Barnet Heating completed heating

North London · EN5 · 2020

Barnet Heating

Category

Heating

Area

Barnet (EN5)

Duration

20 weeks

Completed

2020

Overview

New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Barnet (EN5).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 20 weeks

Gallery

Barnet Heating — Roof detail
Roof detail
Barnet Heating — Heating detail
Heating detail
Barnet Heating — Wider context
Wider context
Barnet Heating — Lower ground level
Lower ground level
Barnet Heating — Leisure space
Leisure space
Barnet Heating — Before works commenced
Before works commenced
Barnet Heating — During construction
During construction
Barnet Heating — First fix underway
First fix underway
Barnet Heating — Close-up craftsmanship
Close-up craftsmanship
Barnet Heating — Living space completed
Living space completed
Barnet Heating — Kitchen detail
Kitchen detail
Barnet Heating — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — EN5 heating (portfolio example, not a real client review)

Project area

Approximate area only — Barnet, EN5. No property addresses are published.