Foxter
Wembley Heating completed heating

North West London · HA9 · 2019

Wembley Heating

Category

Heating

Area

Wembley (HA9)

Duration

16 weeks

Completed

2019

Overview

New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Wembley (HA9).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 16 weeks

Gallery

Wembley Heating — Kitchen detail
Kitchen detail
Wembley Heating — Heating detail
Heating detail
Wembley Heating — Bathroom finishes
Bathroom finishes
Wembley Heating — Loft level
Loft level
Wembley Heating — Exterior
Exterior
Wembley Heating — Garden
Garden
Wembley Heating — Rear elevation
Rear elevation
Wembley Heating — Roof detail
Roof detail
Wembley Heating — Wider context
Wider context
Wembley Heating — Lower ground level
Lower ground level
Wembley Heating — Leisure space
Leisure space
Wembley Heating — Before works commenced
Before works commenced
Wembley Heating — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — HA9 heating (portfolio example, not a real client review)

Project area

Approximate area only — Wembley, HA9. No property addresses are published.