Foxter
Crystal Palace Heating completed heating

South London · SE19 · 2020

Crystal Palace Heating

Category

Heating

Area

Crystal Palace (SE19)

Duration

24 weeks

Completed

2020

Overview

New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Crystal Palace (SE19).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Electrical & lighting
  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery

Materials used

Solid ash joineryAluminium glazingHoned limestonePorcelain large format

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 24 weeks

Gallery

Crystal Palace Heating — Wider context
Wider context
Crystal Palace Heating — Heating detail
Heating detail
Crystal Palace Heating — Lower ground level
Lower ground level
Crystal Palace Heating — Leisure space
Leisure space
Crystal Palace Heating — Before works commenced
Before works commenced
Crystal Palace Heating — During construction
During construction
Crystal Palace Heating — First fix underway
First fix underway
Crystal Palace Heating — Close-up craftsmanship
Close-up craftsmanship
Crystal Palace Heating — Living space completed
Living space completed
Crystal Palace Heating — Kitchen detail
Kitchen detail
Crystal Palace Heating — Bathroom finishes
Bathroom finishes
Crystal Palace Heating — Loft level
Loft level
Crystal Palace Heating — Exterior
Exterior
Crystal Palace Heating — Garden
Garden
Crystal Palace Heating — Completed works
Completed works

Client feedback (illustrative)

Detailing is sharp — the joinery and tiling are what make it.

Illustrative feedback — SE19 heating (portfolio example, not a real client review)

Project area

Approximate area only — Crystal Palace, SE19. No property addresses are published.