South London · SE19 · 2020
Crystal Palace Heating
Category
Heating
Area
Crystal Palace (SE19)
Duration
24 weeks
Completed
2020
Overview
New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Crystal Palace (SE19).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 24 weeks
Gallery















Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — SE19 heating (portfolio example, not a real client review)
Project area
Approximate area only — Crystal Palace, SE19. No property addresses are published.
Related projects
All projects →
EN5Heating · 2020
Barnet Heating
New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Barnet (EN5).
View project →
HA9Heating · 2019
Wembley Heating
New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Wembley (HA9).
View project →
SW15Heating · 2023
Putney Heating
New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Putney (SW15).
View project →