Duration

8 weeks

Completed

2021

Overview

An education refurbishment completed to programme within the summer holiday window. Sample case study set in Bow (E3).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Electrical & lighting
  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery

Materials used

Solid ash joineryAluminium glazingHoned limestonePorcelain large format

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 8 weeks

Gallery

Bow School — Bathroom finishes
Bathroom finishes
Bow School — Schools detail
Schools detail
Bow School — Loft level
Loft level
Bow School — Exterior
Exterior
Bow School — Garden
Garden
Bow School — Rear elevation
Rear elevation
Bow School — Roof detail
Roof detail
Bow School — Wider context
Wider context
Bow School — Lower ground level
Lower ground level
Bow School — Leisure space
Leisure space
Bow School — Before works commenced
Before works commenced
Bow School — During construction
During construction
Bow School — Completed works
Completed works

Client feedback (illustrative)

Detailing is sharp — the joinery and tiling are what make it.

Illustrative feedback — E3 school block (portfolio example, not a real client review)

Project area

Approximate area only — Bow, E3. No property addresses are published.