East London · E3 · 2021
Bow School
Category
Schools
Area
Bow (E3)
Duration
8 weeks
Completed
2021
Overview
An education refurbishment completed to programme within the summer holiday window. Sample case study set in Bow (E3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 8 weeks
Gallery













Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — E3 school block (portfolio example, not a real client review)
Project area
Approximate area only — Bow, E3. No property addresses are published.
Related projects
All projects →
NW8Schools · 2025
St John's Wood School
An education refurbishment completed to programme within the summer holiday window. Sample case study set in St John's Wood (NW8).
View project →
E8Schools · 2024
Hackney School
An education refurbishment completed to programme within the summer holiday window. Sample case study set in Hackney (E8).
View project →
TW9Schools · 2021
Richmond School
An education refurbishment completed to programme within the summer holiday window. Sample case study set in Richmond (TW9).
View project →