Foxter
Richmond School completed schools

South West London · TW9 · 2021

Richmond School

Category

Schools

Area

Richmond (TW9)

Duration

6 weeks

Completed

2021

Overview

An education refurbishment completed to programme within the summer holiday window. Sample case study set in Richmond (TW9).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 6 weeks

Gallery

Richmond School — Kitchen detail
Kitchen detail
Richmond School — Schools detail
Schools detail
Richmond School — Bathroom finishes
Bathroom finishes
Richmond School — Loft level
Loft level
Richmond School — Exterior
Exterior
Richmond School — Garden
Garden
Richmond School — Rear elevation
Rear elevation
Richmond School — Roof detail
Roof detail
Richmond School — Wider context
Wider context
Richmond School — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — TW9 school block (portfolio example, not a real client review)

Project area

Approximate area only — Richmond, TW9. No property addresses are published.