Foxter
St John's Wood School completed schools

North West London · NW8 · 2025

St John's Wood School

Category

Schools

Area

St John's Wood (NW8)

Duration

6 weeks

Completed

2025

Overview

An education refurbishment completed to programme within the summer holiday window. Sample case study set in St John's Wood (NW8).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Carpentry & joinery
  • Electrical & lighting
  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 6 weeks

Gallery

St John's Wood School — Before works commenced
Before works commenced
St John's Wood School — Schools detail
Schools detail
St John's Wood School — During construction
During construction
St John's Wood School — First fix underway
First fix underway
St John's Wood School — Close-up craftsmanship
Close-up craftsmanship
St John's Wood School — Living space completed
Living space completed
St John's Wood School — Kitchen detail
Kitchen detail
St John's Wood School — Bathroom finishes
Bathroom finishes
St John's Wood School — Loft level
Loft level
St John's Wood School — Exterior
Exterior
St John's Wood School — Garden
Garden
St John's Wood School — Rear elevation
Rear elevation
St John's Wood School — Roof detail
Roof detail
St John's Wood School — Wider context
Wider context
St John's Wood School — Lower ground level
Lower ground level
St John's Wood School — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — NW8 school block (portfolio example, not a real client review)

Project area

Approximate area only — St John's Wood, NW8. No property addresses are published.