Foxter
Bromley Flooring completed flooring

South London · BR1 · 2021

Bromley Flooring

Category

Flooring

Area

Bromley (BR1)

Duration

10 weeks

Completed

2021

Overview

Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Bromley (BR1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Bromley Flooring — First fix underway
First fix underway
Bromley Flooring — Flooring detail
Flooring detail
Bromley Flooring — Close-up craftsmanship
Close-up craftsmanship
Bromley Flooring — Living space completed
Living space completed
Bromley Flooring — Kitchen detail
Kitchen detail
Bromley Flooring — Bathroom finishes
Bathroom finishes
Bromley Flooring — Loft level
Loft level
Bromley Flooring — Exterior
Exterior
Bromley Flooring — Garden
Garden
Bromley Flooring — Rear elevation
Rear elevation
Bromley Flooring — Roof detail
Roof detail
Bromley Flooring — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — BR1 flooring (portfolio example, not a real client review)

Project area

Approximate area only — Bromley, BR1. No property addresses are published.