South London · BR1 · 2021
Bromley Flooring
Category
Flooring
Area
Bromley (BR1)
Duration
10 weeks
Completed
2021
Overview
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Bromley (BR1).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Waste management
- Structural calculations
- Groundworks
- Roofing & leadwork
- Plastering
- Painting & decorating
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 10 weeks
Gallery












Client feedback (illustrative)
“The team worked around us and hit every milestone on the schedule.”
Illustrative feedback — BR1 flooring (portfolio example, not a real client review)
Project area
Approximate area only — Bromley, BR1. No property addresses are published.
Related projects
All projects →
W9Flooring · 2021
Maida Vale Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Maida Vale (W9).
View project →
E2Flooring · 2020
Shoreditch Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Shoreditch (E2).
View project →
SW12Flooring · 2024
Balham Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Balham (SW12).
View project →