North West London · W9 · 2021
Maida Vale Flooring
Category
Flooring
Area
Maida Vale (W9)
Duration
8 weeks
Completed
2021
Overview
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Maida Vale (W9).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Tiling
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 8 weeks
Gallery

















Client feedback (illustrative)
“Communication was steady from first survey through to snagging.”
Illustrative feedback — W9 flooring (portfolio example, not a real client review)
Project area
Approximate area only — Maida Vale, W9. No property addresses are published.
Related projects
All projects →
E2Flooring · 2020
Shoreditch Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Shoreditch (E2).
View project →
SW12Flooring · 2024
Balham Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Balham (SW12).
View project →
BR1Flooring · 2021
Bromley Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Bromley (BR1).
View project →