
East London · E2 · 2020
Shoreditch Flooring
Category
Flooring
Area
Shoreditch (E2)
Duration
6 weeks
Completed
2020
Overview
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Shoreditch (E2).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Party wall coordination
- Steelwork
- Plumbing & heating
- Tiling
- Bespoke kitchen install
- Snagging & handover
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 6 weeks
Gallery










Client feedback (illustrative)
“Budget held, drawings were followed, handover was painless.”
Illustrative feedback — E2 flooring (portfolio example, not a real client review)
Project area
Approximate area only — Shoreditch, E2. No property addresses are published.
Related projects
All projects →
W9Flooring · 2021
Maida Vale Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Maida Vale (W9).
View project →
SW12Flooring · 2024
Balham Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Balham (SW12).
View project →
BR1Flooring · 2021
Bromley Flooring
Engineered oak herringbone flooring laid over a levelled and insulated substrate. Sample case study set in Bromley (BR1).
View project →