Foxter
Canary Wharf Heating completed heating

East London · E14 · 2023

Canary Wharf Heating

Category

Heating

Area

Canary Wharf (E14)

Duration

24 weeks

Completed

2023

Overview

New heating system with zoned controls, upgraded emitters and full commissioning. Sample case study set in Canary Wharf (E14).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 24 weeks

Gallery

Canary Wharf Heating — First fix underway
First fix underway
Canary Wharf Heating — Heating detail
Heating detail
Canary Wharf Heating — Close-up craftsmanship
Close-up craftsmanship
Canary Wharf Heating — Living space completed
Living space completed
Canary Wharf Heating — Kitchen detail
Kitchen detail
Canary Wharf Heating — Bathroom finishes
Bathroom finishes
Canary Wharf Heating — Loft level
Loft level
Canary Wharf Heating — Exterior
Exterior
Canary Wharf Heating — Garden
Garden
Canary Wharf Heating — Rear elevation
Rear elevation
Canary Wharf Heating — Roof detail
Roof detail
Canary Wharf Heating — Wider context
Wider context
Canary Wharf Heating — Lower ground level
Lower ground level
Canary Wharf Heating — Leisure space
Leisure space
Canary Wharf Heating — Before works commenced
Before works commenced
Canary Wharf Heating — During construction
During construction
Canary Wharf Heating — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — E14 heating (portfolio example, not a real client review)

Project area

Approximate area only — Canary Wharf, E14. No property addresses are published.