Foxter
Chelsea School completed schools

West London · SW3 · 2024

Chelsea School

Category

Schools

Area

Chelsea (SW3)

Duration

6 weeks

Completed

2024

Overview

An education refurbishment completed to programme within the summer holiday window. Sample case study set in Chelsea (SW3).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Party wall coordination
  • Steelwork
  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install
  • Snagging & handover

Materials used

Blackened metalworkZinc standing seamNatural slateSolid ash joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 6 weeks

Gallery

Chelsea School — Rear elevation
Rear elevation
Chelsea School — Schools detail
Schools detail
Chelsea School — Roof detail
Roof detail
Chelsea School — Wider context
Wider context
Chelsea School — Lower ground level
Lower ground level
Chelsea School — Leisure space
Leisure space
Chelsea School — Before works commenced
Before works commenced
Chelsea School — During construction
During construction
Chelsea School — First fix underway
First fix underway
Chelsea School — Close-up craftsmanship
Close-up craftsmanship
Chelsea School — Living space completed
Living space completed
Chelsea School — Completed works
Completed works

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — SW3 school block (portfolio example, not a real client review)

Project area

Approximate area only — Chelsea, SW3. No property addresses are published.