Foxter
Croydon School completed schools

South London · CR0 · 2025

Croydon School

Category

Schools

Area

Croydon (CR0)

Duration

8 weeks

Completed

2025

Overview

An education refurbishment completed to programme within the summer holiday window. Sample case study set in Croydon (CR0).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Tiling
  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 8 weeks

Gallery

Croydon School — During construction
During construction
Croydon School — Schools detail
Schools detail
Croydon School — First fix underway
First fix underway
Croydon School — Close-up craftsmanship
Close-up craftsmanship
Croydon School — Living space completed
Living space completed
Croydon School — Kitchen detail
Kitchen detail
Croydon School — Bathroom finishes
Bathroom finishes
Croydon School — Loft level
Loft level
Croydon School — Exterior
Exterior
Croydon School — Garden
Garden
Croydon School — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — CR0 school block (portfolio example, not a real client review)

Project area

Approximate area only — Croydon, CR0. No property addresses are published.