
North London · EN1 · 2021
Enfield Shop Front
Category
Shop Fronts
Area
Enfield (EN1)
Duration
24 weeks
Completed
2021
Overview
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Enfield (EN1).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Tiling
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 24 weeks
Gallery















Client feedback (illustrative)
“Communication was steady from first survey through to snagging.”
Illustrative feedback — EN1 shopfront (portfolio example, not a real client review)
Project area
Approximate area only — Enfield, EN1. No property addresses are published.
Related projects
All projects →
N16Shop Fronts · 2024
Stoke Newington Shop Front
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Stoke Newington (N16).
View project →
HA1Shop Fronts · 2023
Harrow Shop Front
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Harrow (HA1).
View project →
SW19Shop Fronts · 2020
Wimbledon Shop Front
A new shopfront in powder-coated steel with toughened glazing and illuminated signage. Sample case study set in Wimbledon (SW19).
View project →