North London · N3 · 2024
Finchley Brickwork
Category
Brickwork
Area
Finchley (N3)
Duration
5 months
Completed
2024
Overview
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Finchley (N3).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Plumbing & heating
- Tiling
- Bespoke kitchen install
- Snagging & handover
- Party wall coordination
- Steelwork
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 5 months
Gallery










Client feedback (illustrative)
“Budget held, drawings were followed, handover was painless.”
Illustrative feedback — N3 facade (portfolio example, not a real client review)
Project area
Approximate area only — Finchley, N3. No property addresses are published.
Related projects
All projects →
W6Brickwork · 2023
Hammersmith Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Hammersmith (W6).
View project →
SE21Brickwork · 2020
Dulwich Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Dulwich (SE21).
View project →
NW6Brickwork · 2023
Kilburn Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Kilburn (NW6).
View project →