Overview
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Hammersmith (W6).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 20 weeks
Gallery
















Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — W6 facade (portfolio example, not a real client review)
Project area
Approximate area only — Hammersmith, W6. No property addresses are published.
Related projects
All projects →
SE21Brickwork · 2020
Dulwich Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Dulwich (SE21).
View project →
N3Brickwork · 2024
Finchley Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Finchley (N3).
View project →
NW6Brickwork · 2023
Kilburn Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Kilburn (NW6).
View project →