
North West London · NW6 · 2023
Kilburn Brickwork
Category
Brickwork
Area
Kilburn (NW6)
Duration
24 weeks
Completed
2023
Overview
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Kilburn (NW6).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Snagging & handover
- Party wall coordination
- Steelwork
- Plumbing & heating
- Tiling
- Bespoke kitchen install
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 24 weeks
Gallery











Client feedback (illustrative)
“Communication was steady from first survey through to snagging.”
Illustrative feedback — NW6 facade (portfolio example, not a real client review)
Project area
Approximate area only — Kilburn, NW6. No property addresses are published.
Related projects
All projects →
W6Brickwork · 2023
Hammersmith Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Hammersmith (W6).
View project →
SE21Brickwork · 2020
Dulwich Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Dulwich (SE21).
View project →
N3Brickwork · 2024
Finchley Brickwork
Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Finchley (N3).
View project →