Kilburn Brickwork completed brickwork

North West London · NW6 · 2023

Kilburn Brickwork

Category

Brickwork

Area

Kilburn (NW6)

Duration

24 weeks

Completed

2023

Overview

Facade repair, repointing in lime mortar and rebuilt parapet detail. Sample case study set in Kilburn (NW6).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install

Materials used

Powder-coated steelReclaimed London stock brickPolished concreteEngineered oak

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 24 weeks

Gallery

Kilburn Brickwork — Loft level
Loft level
Kilburn Brickwork — Brickwork detail
Brickwork detail
Kilburn Brickwork — Exterior
Exterior
Kilburn Brickwork — Garden
Garden
Kilburn Brickwork — Rear elevation
Rear elevation
Kilburn Brickwork — Roof detail
Roof detail
Kilburn Brickwork — Wider context
Wider context
Kilburn Brickwork — Lower ground level
Lower ground level
Kilburn Brickwork — Leisure space
Leisure space
Kilburn Brickwork — Before works commenced
Before works commenced
Kilburn Brickwork — Completed works
Completed works

Client feedback (illustrative)

Communication was steady from first survey through to snagging.

Illustrative feedback — NW6 facade (portfolio example, not a real client review)

Project area

Approximate area only — Kilburn, NW6. No property addresses are published.