Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Pimlico (SW1V).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 7 months
Gallery











Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — SW1V structure (portfolio example, not a real client review)
Project area
Approximate area only — Pimlico, SW1V. No property addresses are published.
Related projects
All projects →
NW1Structural Steel · 2022
Camden Structural Steel
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Camden (NW1).
View project →
E15Structural Steel · 2021
Stratford Structural Steel
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Stratford (E15).
View project →
SW18Structural Steel · 2025
Wandsworth Structural Steel
Structural steel installation removing load-bearing walls to open the ground floor plan. Sample case study set in Wandsworth (SW18).
View project →