Foxter
Romford Gas Installation completed gas installation

East London · RM1 · 2022

Romford Gas Installation

Category

Gas Installation

Area

Romford (RM1)

Duration

20 weeks

Completed

2022

Overview

Gas supply upgrade and appliance installation certified on completion. Sample case study set in Romford (RM1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 20 weeks

Gallery

Romford Gas Installation — Roof detail
Roof detail
Romford Gas Installation — Gas Installation detail
Gas Installation detail
Romford Gas Installation — Wider context
Wider context
Romford Gas Installation — Lower ground level
Lower ground level
Romford Gas Installation — Leisure space
Leisure space
Romford Gas Installation — Before works commenced
Before works commenced
Romford Gas Installation — During construction
During construction
Romford Gas Installation — First fix underway
First fix underway
Romford Gas Installation — Close-up craftsmanship
Close-up craftsmanship
Romford Gas Installation — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — RM1 gas works (portfolio example, not a real client review)

Project area

Approximate area only — Romford, RM1. No property addresses are published.