Overview
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Bank (EC2).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Electrical & lighting
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 12 weeks
Gallery

















Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — EC2 tiling (portfolio example, not a real client review)
Project area
Approximate area only — Bank, EC2. No property addresses are published.
Related projects
All projects →
N10Tiling · 2022
Muswell Hill Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Muswell Hill (N10).
View project →
SW6Tiling · 2025
Fulham Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Fulham (SW6).
View project →
SE10Tiling · 2022
Greenwich Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Greenwich (SE10).
View project →