Foxter
Greenwich Tiling completed tiling

South London · SE10 · 2022

Greenwich Tiling

Category

Tiling

Area

Greenwich (SE10)

Duration

12 weeks

Completed

2022

Overview

Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Greenwich (SE10).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 12 weeks

Gallery

Greenwich Tiling — Exterior
Exterior
Greenwich Tiling — Tiling detail
Tiling detail
Greenwich Tiling — Garden
Garden
Greenwich Tiling — Rear elevation
Rear elevation
Greenwich Tiling — Roof detail
Roof detail
Greenwich Tiling — Wider context
Wider context
Greenwich Tiling — Lower ground level
Lower ground level
Greenwich Tiling — Leisure space
Leisure space
Greenwich Tiling — Before works commenced
Before works commenced
Greenwich Tiling — During construction
During construction
Greenwich Tiling — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — SE10 tiling (portfolio example, not a real client review)

Project area

Approximate area only — Greenwich, SE10. No property addresses are published.