North London · N10 · 2022
Muswell Hill Tiling
Category
Tiling
Area
Muswell Hill (N10)
Duration
10 weeks
Completed
2022
Overview
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Muswell Hill (N10).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Party wall coordination
- Steelwork
- Plumbing & heating
- Tiling
- Bespoke kitchen install
- Snagging & handover
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 10 weeks
Gallery
















Client feedback (illustrative)
“Budget held, drawings were followed, handover was painless.”
Illustrative feedback — N10 tiling (portfolio example, not a real client review)
Project area
Approximate area only — Muswell Hill, N10. No property addresses are published.
Related projects
All projects →
EC2Tiling · 2019
Bank Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Bank (EC2).
View project →
SW6Tiling · 2025
Fulham Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Fulham (SW6).
View project →
SE10Tiling · 2022
Greenwich Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Greenwich (SE10).
View project →