Foxter
Fulham Tiling completed tiling

West London · SW6 · 2025

Fulham Tiling

Category

Tiling

Area

Fulham (SW6)

Duration

10 weeks

Completed

2025

Overview

Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Fulham (SW6).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting
  • Flooring
  • Building control sign-off

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Fulham Tiling — Wider context
Wider context
Fulham Tiling — Tiling detail
Tiling detail
Fulham Tiling — Lower ground level
Lower ground level
Fulham Tiling — Leisure space
Leisure space
Fulham Tiling — Before works commenced
Before works commenced
Fulham Tiling — During construction
During construction
Fulham Tiling — First fix underway
First fix underway
Fulham Tiling — Close-up craftsmanship
Close-up craftsmanship
Fulham Tiling — Living space completed
Living space completed
Fulham Tiling — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — SW6 tiling (portfolio example, not a real client review)

Project area

Approximate area only — Fulham, SW6. No property addresses are published.