Foxter
Crouch End Tiling completed tiling

North London · N8 · 2019

Crouch End Tiling

Category

Tiling

Area

Crouch End (N8)

Duration

14 weeks

Completed

2019

Overview

Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Crouch End (N8).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Bespoke kitchen install
  • Snagging & handover
  • Party wall coordination
  • Steelwork
  • Plumbing & heating
  • Tiling

Materials used

Blackened metalworkZinc standing seamNatural slateSolid ash joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 14 weeks

Gallery

Crouch End Tiling — Living space completed
Living space completed
Crouch End Tiling — Tiling detail
Tiling detail
Crouch End Tiling — Kitchen detail
Kitchen detail
Crouch End Tiling — Bathroom finishes
Bathroom finishes
Crouch End Tiling — Loft level
Loft level
Crouch End Tiling — Exterior
Exterior
Crouch End Tiling — Garden
Garden
Crouch End Tiling — Rear elevation
Rear elevation
Crouch End Tiling — Roof detail
Roof detail
Crouch End Tiling — Wider context
Wider context
Crouch End Tiling — Lower ground level
Lower ground level
Crouch End Tiling — Completed works
Completed works

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — N8 tiling (portfolio example, not a real client review)

Project area

Approximate area only — Crouch End, N8. No property addresses are published.