Foxter
Dulwich Plumbing completed plumbing

South London · SE21 · 2019

Dulwich Plumbing

Category

Plumbing

Area

Dulwich (SE21)

Duration

10 weeks

Completed

2019

Overview

Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Dulwich (SE21).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Party wall coordination
  • Steelwork
  • Plumbing & heating
  • Tiling
  • Bespoke kitchen install
  • Snagging & handover

Materials used

Blackened metalworkZinc standing seamNatural slateSolid ash joinery

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Dulwich Plumbing — Loft level
Loft level
Dulwich Plumbing — Plumbing detail
Plumbing detail
Dulwich Plumbing — Exterior
Exterior
Dulwich Plumbing — Garden
Garden
Dulwich Plumbing — Rear elevation
Rear elevation
Dulwich Plumbing — Roof detail
Roof detail
Dulwich Plumbing — Wider context
Wider context
Dulwich Plumbing — Lower ground level
Lower ground level
Dulwich Plumbing — Leisure space
Leisure space
Dulwich Plumbing — Completed works
Completed works

Client feedback (illustrative)

Budget held, drawings were followed, handover was painless.

Illustrative feedback — SE21 plumbing (portfolio example, not a real client review)

Project area

Approximate area only — Dulwich, SE21. No property addresses are published.