Foxter
Marylebone Plumbing completed plumbing

Central London · W1 · 2023

Marylebone Plumbing

Category

Plumbing

Area

Marylebone (W1)

Duration

10 weeks

Completed

2023

Overview

Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Marylebone (W1).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Groundworks
  • Roofing & leadwork
  • Plastering
  • Painting & decorating
  • Waste management
  • Structural calculations

Materials used

Porcelain large formatMarble compositeClay plasterPowder-coated steel

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 10 weeks

Gallery

Marylebone Plumbing — First fix underway
First fix underway
Marylebone Plumbing — Plumbing detail
Plumbing detail
Marylebone Plumbing — Close-up craftsmanship
Close-up craftsmanship
Marylebone Plumbing — Living space completed
Living space completed
Marylebone Plumbing — Kitchen detail
Kitchen detail
Marylebone Plumbing — Bathroom finishes
Bathroom finishes
Marylebone Plumbing — Loft level
Loft level
Marylebone Plumbing — Exterior
Exterior
Marylebone Plumbing — Garden
Garden
Marylebone Plumbing — Rear elevation
Rear elevation
Marylebone Plumbing — Roof detail
Roof detail
Marylebone Plumbing — Wider context
Wider context
Marylebone Plumbing — Lower ground level
Lower ground level
Marylebone Plumbing — Leisure space
Leisure space
Marylebone Plumbing — Before works commenced
Before works commenced
Marylebone Plumbing — Completed works
Completed works

Client feedback (illustrative)

The team worked around us and hit every milestone on the schedule.

Illustrative feedback — W1 plumbing (portfolio example, not a real client review)

Project area

Approximate area only — Marylebone, W1. No property addresses are published.