Foxter
Hammersmith Plumbing completed plumbing

West London · W6 · 2022

Hammersmith Plumbing

Category

Plumbing

Area

Hammersmith (W6)

Duration

8 weeks

Completed

2022

Overview

Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Hammersmith (W6).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Painting & decorating
  • Waste management
  • Structural calculations
  • Groundworks
  • Roofing & leadwork
  • Plastering

Materials used

Douglas fir structureMicro-cementBrushed brassBlackened metalwork

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 8 weeks

Gallery

Hammersmith Plumbing — Roof detail
Roof detail
Hammersmith Plumbing — Plumbing detail
Plumbing detail
Hammersmith Plumbing — Wider context
Wider context
Hammersmith Plumbing — Lower ground level
Lower ground level
Hammersmith Plumbing — Leisure space
Leisure space
Hammersmith Plumbing — Before works commenced
Before works commenced
Hammersmith Plumbing — During construction
During construction
Hammersmith Plumbing — First fix underway
First fix underway
Hammersmith Plumbing — Close-up craftsmanship
Close-up craftsmanship
Hammersmith Plumbing — Living space completed
Living space completed
Hammersmith Plumbing — Kitchen detail
Kitchen detail
Hammersmith Plumbing — Bathroom finishes
Bathroom finishes
Hammersmith Plumbing — Loft level
Loft level
Hammersmith Plumbing — Exterior
Exterior
Hammersmith Plumbing — Garden
Garden
Hammersmith Plumbing — Rear elevation
Rear elevation
Hammersmith Plumbing — Completed works
Completed works

Client feedback (illustrative)

A difficult structure handled calmly and finished beautifully.

Illustrative feedback — W6 plumbing (portfolio example, not a real client review)

Project area

Approximate area only — Hammersmith, W6. No property addresses are published.