
North London · N5 · 2019
Highbury Plumbing
Category
Plumbing
Area
Highbury (N5)
Duration
8 weeks
Completed
2019
Overview
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Highbury (N5).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 8 weeks
Gallery















Client feedback (illustrative)
“Detailing is sharp — the joinery and tiling are what make it.”
Illustrative feedback — N5 plumbing (portfolio example, not a real client review)
Project area
Approximate area only — Highbury, N5. No property addresses are published.
Related projects
All projects →
W1Plumbing · 2023
Marylebone Plumbing
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Marylebone (W1).
View project →
W6Plumbing · 2022
Hammersmith Plumbing
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Hammersmith (W6).
View project →
SE21Plumbing · 2019
Dulwich Plumbing
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Dulwich (SE21).
View project →