Overview

Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Finchley (N3).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Electrical & lighting
  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery

Materials used

Solid ash joineryAluminium glazingHoned limestonePorcelain large format

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 12 weeks

Gallery

Finchley Plumbing — Close-up craftsmanship
Close-up craftsmanship
Finchley Plumbing — Plumbing detail
Plumbing detail
Finchley Plumbing — Living space completed
Living space completed
Finchley Plumbing — Kitchen detail
Kitchen detail
Finchley Plumbing — Bathroom finishes
Bathroom finishes
Finchley Plumbing — Loft level
Loft level
Finchley Plumbing — Exterior
Exterior
Finchley Plumbing — Garden
Garden
Finchley Plumbing — Rear elevation
Rear elevation
Finchley Plumbing — Roof detail
Roof detail
Finchley Plumbing — Completed works
Completed works

Client feedback (illustrative)

Detailing is sharp — the joinery and tiling are what make it.

Illustrative feedback — N3 plumbing (portfolio example, not a real client review)

Project area

Approximate area only — Finchley, N3. No property addresses are published.