
West London · W14 · 2022
Holland Park Tiling
Category
Tiling
Area
Holland Park (W14)
Duration
14 weeks
Completed
2022
Overview
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Holland Park (W14).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Flooring
- Building control sign-off
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 14 weeks
Gallery














Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — W14 tiling (portfolio example, not a real client review)
Project area
Approximate area only — Holland Park, W14. No property addresses are published.
Related projects
All projects →
N10Tiling · 2022
Muswell Hill Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Muswell Hill (N10).
View project →
EC2Tiling · 2019
Bank Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Bank (EC2).
View project →
SW6Tiling · 2025
Fulham Tiling
Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Fulham (SW6).
View project →