Foxter
Holland Park Tiling completed tiling

West London · W14 · 2022

Holland Park Tiling

Category

Tiling

Area

Holland Park (W14)

Duration

14 weeks

Completed

2022

Overview

Large format tiling with laser-set levels and minimal grout junctions. Sample case study set in Holland Park (W14).

Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.

Portfolio example — concept case study

Services provided

  • Flooring
  • Building control sign-off
  • Design & planning support
  • Demolition & strip-out
  • Carpentry & joinery
  • Electrical & lighting

Materials used

Engineered oakLime mortarTerrazzoDouglas fir structure

Before & after

After completion
Before works
BeforeAfter

Timeline

01

Survey & design

Measured survey, drawings and approvals.

02

Strip-out & structure

Demolition, groundworks and steelwork.

03

First & second fix

Services, joinery, plaster and tiling.

04

Finish & handover

Decoration, commissioning and snagging.

Total programme: 14 weeks

Gallery

Holland Park Tiling — Garden
Garden
Holland Park Tiling — Tiling detail
Tiling detail
Holland Park Tiling — Rear elevation
Rear elevation
Holland Park Tiling — Roof detail
Roof detail
Holland Park Tiling — Wider context
Wider context
Holland Park Tiling — Lower ground level
Lower ground level
Holland Park Tiling — Leisure space
Leisure space
Holland Park Tiling — Before works commenced
Before works commenced
Holland Park Tiling — During construction
During construction
Holland Park Tiling — First fix underway
First fix underway
Holland Park Tiling — Close-up craftsmanship
Close-up craftsmanship
Holland Park Tiling — Living space completed
Living space completed
Holland Park Tiling — Kitchen detail
Kitchen detail
Holland Park Tiling — Completed works
Completed works

Client feedback (illustrative)

Clear programme, tidy site and a finish that lifted the whole house.

Illustrative feedback — W14 tiling (portfolio example, not a real client review)

Project area

Approximate area only — Holland Park, W14. No property addresses are published.