Overview
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Kilburn (NW6).
Works were sequenced to keep the property secure and weathertight throughout, with a single site manager coordinating every trade from strip-out to final snagging.
Portfolio example — concept case study
Services provided
- Design & planning support
- Demolition & strip-out
- Carpentry & joinery
- Electrical & lighting
- Flooring
- Building control sign-off
Materials used
Before & after


Timeline
01
Survey & design
Measured survey, drawings and approvals.
02
Strip-out & structure
Demolition, groundworks and steelwork.
03
First & second fix
Services, joinery, plaster and tiling.
04
Finish & handover
Decoration, commissioning and snagging.
Total programme: 10 weeks
Gallery












Client feedback (illustrative)
“Clear programme, tidy site and a finish that lifted the whole house.”
Illustrative feedback — NW6 plumbing (portfolio example, not a real client review)
Project area
Approximate area only — Kilburn, NW6. No property addresses are published.
Related projects
All projects →
N5Plumbing · 2019
Highbury Plumbing
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Highbury (N5).
View project →
W1Plumbing · 2023
Marylebone Plumbing
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Marylebone (W1).
View project →
W6Plumbing · 2022
Hammersmith Plumbing
Full re-pipe with new manifolds, pressurised hot water and modern sanitaryware. Sample case study set in Hammersmith (W6).
View project →