Foxter
Agent

Roofing · London

London roofing projects and work stages

What a Foxter roofing job looks like from survey to sign-off. Completed projects appear here only once the work is verified and the client has agreed to publication; the work-stage examples below are illustrative and are not client projects.

Roof type

Area (completed projects)

Completed roofing projects

No verified, client-approved roofing project has been published for SW4 yet. We serve this area; completed jobs are added only with genuine photographs and the client's consent.

Illustrative work stages — not client projects

Roofing work, stage by stage

Images in this section are illustrative and do not show Foxter client properties. Each sequence describes how that type of roofing work is typically surveyed, carried out and checked.

Fibreglass / GRP

Rear extension flat roof re-covered in GRP

  1. Illustrative image: before stage of fibreglass / grp workIllustrative

    Before

    Existing felt checked for ponding, blistering and a soft deck; outlet, upstands and any rooflight details measured.

  2. Illustrative image: in progress stage of fibreglass / grp workIllustrative

    In progress

    Old covering stripped, decking replaced where soft, falls corrected, then GRP laminate laid with trims and a properly formed outlet.

  3. Illustrative image: completed stage of fibreglass / grp workIllustrative

    Completed

    Topcoat cured and the roof photographed with outlets clear; manufacturer guidance for the system handed over.

Areas served for roofing

Areas we serve, not a list of completed jobs. Each guide has local roofing notes on housing stock, conservation areas and access. A district is marked “completed project” only when a verified job is published.