Foxter
Agent

Roofing · London

London roofing projects and work stages

What a Foxter roofing job looks like from survey to sign-off. Completed projects appear here only once the work is verified and the client has agreed to publication; the work-stage examples below are illustrative and are not client projects.

Roof type

Area (completed projects)

Completed roofing projects

No verified, client-approved roofing project has been published for W12 yet. We serve this area; completed jobs are added only with genuine photographs and the client's consent.

Illustrative work stages — not client projects

Roofing work, stage by stage

Images in this section are illustrative and do not show Foxter client properties. Each sequence describes how that type of roofing work is typically surveyed, carried out and checked.

Flat roof

Leaking flat roof over a bay or dormer

  1. Illustrative image: before stage of flat roof workIllustrative

    Before

    Moisture traced on the deck and at upstands; repair versus re-cover decision explained with photographs.

  2. Illustrative image: in progress stage of flat roof workIllustrative

    In progress

    Local repair or full re-cover in the agreed system (felt, single-ply or GRP), with upstands and drips detailed to the wall.

  3. Illustrative image: completed stage of flat roof workIllustrative

    Completed

    Finished roof and junctions photographed; drainage checked.

Areas served for roofing

Areas we serve, not a list of completed jobs. Each guide has local roofing notes on housing stock, conservation areas and access. A district is marked “completed project” only when a verified job is published.